Sadid Pipe Production Factory
Project Introduction
- Project Properties :
1. Earth Work, Executing Lean Concrete, Form Working, Executing Isolation,Executing Reinforced Concreting.
2. Water Storage Pools.
3. Executing Subbase & Base of The Rail Road With Length Of 334m.
4. Construction Of 500 Precast Concrete Piles. The Length Of The Piles Were 15m & With 40*40 (cm) Section.
5. Driving Of 500 Precast Concrete Piles. The Length Of The Piles Were 15m & With 40*40 (cm) Section.
6. Chipping The Piles And Earth Work.