- Project Properties :
1. Excavation 330,000 m3
2. Filling 120,000 m3
3. Concrete 40,000 m3
4. Rebar Works 3,500 Ton
5. Form Work 82,000 m2
6. Heavy Steel Works 350 Ton
7. Aluminum Works 25,000 m2
8. Preparation and Construction Asphalt Concrete 410,000 m2